Most of the times two groups of buildings have emergent need to rehabilitation and retrofit:
The first group is ; built buildings which are intended to be transformed and the second group is buildings which are designed and built based on the old codes and regulations but the manager (master) wants to update the structure according to new standards and regulations and keep it safe from the earthquake.
The civil treasure professional group always tries to present plans that in addition to securing existing structure , don’t have any interfere with architecture and building’s installations by having BIM and rehabilitation teams and parallel cooperation of these two teams in rehabilitation projects.
